Display Requirements: The vertical spacing of displaying shelves must be adjustable within a range of 260 mm to 320 mm, with a minimum adjustment increment of less than 25 mm. The spacing between the wires of the shelving racks must be less than 15 mm, and the load-bearing capacity must exceed 50 kg/m². Bottles must remain stable and must not tip over when being pushed across the shelf surface. The maximum internal height must be bigger than 720 mm. The effective display area on the outer side of the unit (facing away from the door) requires uniform illumination to ensure that the bottled beverages are clearly visible.
Scenario Requirements: The on-site installation method is embedding it within the countertop. The refrigeration system's airflow must utilize a front-intake, front-exhaust configuration. The external height dimensions must fall within the range of 880 to 910 mm. Comprehensive consideration must be given to 4M1 operating environments (such as supermarkets and dining establishments),and 5M1 operating environments ( specifically indoor spaces lacking air conditioning). Regarding storage, handling, transportation, and final placement upon arrival at the site, the equipment must be easy to maneuver and free of any safety hazards. During operation, the equipment must require only simple maintenance and upkeep; on-site welding repairs are strictly prohibited. Furthermore, equipment operational data must be digitized, and daily management processes must be integrated into a centralized platform.
Performance Requirements: Performance metrics shall meet the standards for the 4M1, and 5M1 grades, respectively. Energy consumption metrics shall meet or exceed the 7 stars rating under the GEMS standard. The inner and outer panes of the glass doors shall be constructed from tempered glass; the doors shall be reversible (allowing for left-to-right interchangeability), offer excellent transparency, and satisfy anti-condensation requirements.
Operational Requirements: The service life of the equipment shall exceed 10 years. The equipment maintenance rate shall be less than 2%; the on-site repair time for equipment faults shall be less than 2 hours; and the total duration of any equipment malfunction shall not exceed 24 hours. For decommissioned units, the recyclable component ratio shall exceed 25% of the total weight of the complete machine.
Technical Processes:
Cassette Structural Design: Mechanical components—such as the compressor, condenser, and evaporator—and electrical components—including temperature sensors, fans, and pressure controls—are integrated into a single, modular unit. The thermostat—which handles temperature control, display functions, and data interaction—is mounted on the cabinet housing; two wiring harnesses facilitate a quick-connect/disconnect interface between the unit and the thermostat. This structural design enables rapid assembly and disassembly feature. for operation, this rapid assembly/disassembly feature facilitates a quick-swap maintenance strategy; provided a spare unit is available on-site, malfunctions can easily be resolved within one hour. Simultaneously, a single standardized unit can be utilized across multiple equipment models, thereby significantly simplifying operational management.
Platform-based Information Management: Operational data—including temperatures within the cabinet, evaporator, and condenser, as well as operating parameters for electrical components such as compressors and fans—is recorded and stored during the thermostat's operational management process. This enables direct human-machine interaction via the thermostat interface or a user's mobile phone. Through their mobile devices, users can facilitate the digital exchange of information between the device's thermostat and cloud-based storage. Furthermore, leveraging a powerful management platform, office-based staff can utilize desktop computers to oversee the daily management of numerous devices deployed across the market. The scope of this daily management encompasses not only ensuring the proper functioning of the equipment but also monitoring the sales performance of the products housed within the devices, managing equipment asset operations (e.g., power consumption, usage frequency, location changes, etc.), and overseeing the daily activities of the operational team.
Cabinet Structure: Three specifications have been established regarding length: two-door, three-door, and four-door units. The design requires that the door modules be interchangeable and that the number of shelf models be minimized to facilitate ease of management during actual operations.
Structural Features: Shelf assembly comprising shelves, ladders, and plastic crambles. Easily detachable and installable price strips. Reversible doors (left/right) offering various configuration options. Integrated temperature control system. Cassette unit for easy installation and removal. Transportable via standard vans. Designed for modular, replaceable-component maintenance.
Operational Processes:
Sample manufacture:Technical model design took 4 weeks. The foaming molds were procured and managed internally by our manufacturing facility. Basic performance testing and functional verification of the initial prototype were organized and conducted by our factory. A joint evaluation of the initial prototype was then performed.
Pilot Production: The cost of the foaming molds was borne by the client, while the ODM factory assumed responsibility for their acceptance and utilization. Product certification costs were covered by the client, with the ODM factory providing the necessary prototypes and technical support. The ODM factory provided the product's Bill of Materials (BOM) and material cost breakdown, and the final product pricing strategy was mutually agreed upon.3 Product Models: BBR2L ,BBR3L ,BBR4L
Mass Production: The client places orders in advance and pays a 50% deposit; the ODM factory delivers the goods within 5 weeks, with responsibility extending to FOB Qingdao Port.